For full functionality of this site it is necessary to enable JavaScript.
EMIN.COM.LA
0

LIVE WEBINAR: A new way of analyzing signals across time, frequency and digital domains on the 4/5/6 Series MSO Oscilloscopes

07/09/y 10:55:19

EMIN Viet Nam would like to invite you to join the webinar Topic: A new way of analyzing signals across time, frequency and digital domains on the 4/5/6 Series MSO Oscilloscopes

EMIN Viet Nam would like to invite you to join the webinar Topic: A new way of analyzing signals across time, frequency and digital domains on the 4/5/6 Series MSO Oscilloscopes. The event is oganized by Tektronix.

  • Date: September 22, 2021 (WED)

  • Time: 11:00AM (GTM+8)


Debugging embedded systems often involves looking for clues that are hard to discover just by looking at one domain at a time. The ability to look at time and frequency domains simultaneously can offer important insights.

Mixed domain analysis is especially useful for answering questions such as:

  • What's going on with my power rail voltage when I'm transmitting wireless and RF data?

  • Where are the emissions coming from when I access memory? 

  • How long does it take for my PLL to stabilize after power-on?

Join our live webinar today as we explore how you can analyze both time and frequency domains on your scope


ຂ່າວທີ່ກ່ຽວຂ້ອງ

Triển lãm "Dây & Cáp điện 2026" - Ngày 2
25/11/y 14:31:19

Tại gian hàng D02, EMIN mang 4 thiết bị Rohde & Schwarz đến để trưng bày và vận hành trực tiếp: máy phân tích tín hiệu và phổ R&S®FSV3044, máy hiện sóng hiệu năng cao R&S®RTP134, máy phân tích mạng vector R&S®ZNLE4 và máy phân tích mạng vector cầm tay R&S®ZNH18

What Is 5 µs End-to-End Sync Verification in Substations?
25/11/y 10:55:08

In a 50 Hz digital substation using 80 Sampled Values per cycle, samples are 250 µs apart. End-to-end verification examines whether timing alignment is maintained so protection functions can use comparable measurements.

How Should Data Center Protection Relays Be Tested?
25/11/y 10:53:58

Data center relay testing should verify UPS transfer behavior, overcurrent pickup and reset, selectivity between switchgear levels, and generator protection outputs against approved settings.

ຕິດຕາມຂ່າວສານ ແລະ ຂໍ້ສະເໜີ

ຮັບສ່ວນຫຼຸດພິເສດຕາມປະລິມານ, ອັບເດດລາຄາຂາຍສົ່ງ ແລະ ການແຈ້ງເຕືອນສິນຄ້າໃໝ່ສົ່ງກົງເຖິງອິນບັອກຂອງທ່ານ.

ໂດຍການສະໝັກສະມາຊິກ, ທ່ານຍອມຮັບ ເງື່ອນໄຂການໃຫ້ບໍລິການ ແລະ ນະໂຍບາຍຄວາມເປັນສ່ວນຕົວ ຂອງພວກເຮົາ.

ການຊ່ວຍເຫຼືໍາດ່ວນ

ເຂົ້າເຖິງຜູ້ຊ່ຽວຊານທີ່ໄດ້ຮັບການຢັ້ງຢືນຂອງພວກເຮົາໂດຍກົງ